Smile new index

martedì, giugno 1st, 2010

As said today , Here it’s possible to find the new version of our index.

We will upload soon the questions for Zanone and the reviewed presentation, according to what discuss into the meeting.

In the mean time, that’s what you see today:

Smile

Footprint_Smile

SWG-FIRST | Knitting Machines

Regards

Team C

Next steps and Skype meeting

martedì, maggio 18th, 2010

Dear students,

thanks for uploading your work.

By using Skype, on May 27 we will have a meeting to see the progress of the project (according to the examples shown below)

h. 14.00-15.00 _ TEAM A

h. 15.00-16.00 _ TEAM B

h. 16.00-17.00_ TEAM C


FEEDBACK

TEAM A| The index is to be defined more, add more depth and give it to a more systematic, you take the example of a report posted on the blog.

Organize the index from macro to micro, in the first part told about the research and in the second present the service and inspiration you have deducted from case studies.
Your project is not described, is not shown, is not detailed … how it develops?

We suggest you look at the work of TEAM B.

For the meeting of May 27, look at two examples added in this post and start to define and describe your project according to these formats.

TEAM B| Report index is well structured, detailed and complete.
The service description is just mentioned, you have to explode the different steps of the process by showing the links between service and users: how, where and by using tools / technologies
the service is provided.
You must add some minimum references about appearance and atmosphere of space.

For the meeting of May 27, look at two examples added in this post and start to define and describe your project according to these formats.

TEAM C| Report index is fairly structured. Organize the index from macro to micro, in the first part told about the research and in the second present the service and inspiration you have deducted from case studies.

The service must be described in detail, showing the stages of of the process, the physical interface and what is offered.

We suggest you look at the work of TEAM B.

For the meeting of May 27, look at two examples added in this post and start to define and describe your project according to these formats.

FORMATS:

1.  http://www.megaupload.com/?d=OCE28MOF

format used in a Sintesi finale project that contains  “ingredients” necessary to describe a service;

2. esempio descrizione Servizio FASP

format used in a Sintesi finale project that shows some examples of narrative and display, containing a good level of communication and aesthetics

To prepare for the meeting (May 27), by using the formats:

- define and describe the service,

- adapt according to the offer defined: touch points, locations, evidences…

We announce a seminar about interesting services: CREATIVITY AND LOCAL DEVELOPMENT, on  June 16 at the AULA CASTIGLIONI, Via Durando 10. You can watch the testimony of the founder of THE HUB.

January 14th:Skype Meeting

venerdì, gennaio 8th, 2010

Dear All,
We want to remember you next meeting on Thursday, January 14th:
Team A 14.00 – 15.00
Team B 15.00 – 16.00
Team C 16.00 – 17.00

During the review you should describe the concept in detail, describing the idea that is the basis of your project with progress compared to the previous revision.
The following week (18-24 January) you posted on the blog a document that contains the elaboration of progress compared to what was said during the meeting.
In this way students and teachers will be updated about progress work.

The next meeting will be in Milan on Tuesday, February 23 h.10.00-16.00.

How to describe the final project:
- Describe explicitly (graphically and / or textually) the steps that have led to the idea generation and how the idea has become a concept;
- Briefly define, as graphically as possible, the idea of service (using maps, graphs ,etc…)
- Create a storyboard (and environment) to illustrate the concept of service.

Give us a confirm for ’skype meeting on January 14th and the meeting in Milan on February 23rd.

Workshop day – November 4th programme

sabato, ottobre 24th, 2009

Dear teams,

here you can find the workshop programme.

Agenda

h. 10.00 – 10.40

Introduction to the workshop day programme.

(working method and thematic areas)

Stefano Maffei

h. 10.45 – 11.00

Presentation: Production and urban context. – Pier Paolo Peruccio

h. 11.00 – 11.20

Presentation: Business models and extended liability company. – Nicola Spiller

h. 11.20 – 11.40

Presentation: Visualization techniques. – Viola Chiara Vecchi

h. 11.40 – 12.00

A framework for fashion product – start collection. – Alessandro Casinovi

h. 12.00 – 13.00

Team presentations.

h. 13.00 – 13.30

Discussion.

h. 13.30 – 14.00

Lunch break.

h. 14.00 – 16.00

Elaboration of the project-brief for each team.

ASP_Programma_4 novembre_2009 eng

Workshop day – June 9th programme

martedì, maggio 26th, 2009

Dear teams,

here you can find the workshop programme.

Who

Stefano Maffei, Paola Bertola, Beatrice Villari, Pier Paolo Peduccio, Nicola Spiller, Alessandro Casinovi, Massimo Bianchini, Laura Laurenzi, Viola Chaira Vecchi.

What

Case histories presentation

Working method description

Where

Politecnico di Milano, Via Durando 38/A

V piano Sala riunioni

Agenda

h. 10.00

Introduction to the workshop day programme.

Taking stock of the situation (what we did? What will we do?)

h. 10.30

Presentation: Tissage. A knitwear workshop-store for on-site production and selling. – Laura Laurenzi

h. 11.00

Team A: Case histories presentation

h. 11.30

Team B: Case histories presentation

h. 12.00

Team C: Case histories presentation

h. 12.00 – 15.00

Brainstorming to elaborate several project proposals.

Identify project scenarios and elaborate service projects to develop a new kind of on-site knitwear production.

Particular attention will be given to develop some Service Ideas that:

- tackle issues and cruxes related with considered production process;

- Fall within the areas identified during WORK_01 and WORK_02 (Business, Distribution, Product, Service).

Output: a presentation (max 8 slides).

A project scenario to build a system that makes concrete the idea to design, produce and sale in a short time and in the same site (related to available technologies and alternative production systems).

h. 15.00

Brainstorming activity presentation (10’ for each team)

h. 15.30

ASP teaching staff discussion about:

Areas assignment,

Team’s output (case histories, project scenarios).

h. 16

Team’s presentation comment (case histories + scenarios)

Project-brief assignment.

Presentazione visite alle aziende [metà giugno, data da definire] – Alessandro Casinovi

Programma per visite a Carpi (SHIMA SEIKI, Sintesi FASHION Group) date – attività- logistica.

Planning dates

To do for collective meeting (June 9th):

venerdì, maggio 15th, 2009

- Case histories report (printed);
- Cases histories presentation (power point, flash, pdf, etc) containing:
       1. assigned case histories (images, main and innovative aspects),
       2. keywords map (WORK_01) updated with developed case histories,
       3. project scenarios related with issues, areas, experiences pointed out by analysed cases,
       4. opportunities / challenges of the identified project scenarios;
- digital report and presentation;
- post on http://www.newitalianlandscape.it/fasp every case history (proposed and approved) with a photo and a short abstract.

Meeting on June 9th

martedì, maggio 12th, 2009

We confirm the next meeting

on Thursday, June 9th 2009

at Politecnico di Milano (Bovisa),

via Durando 38/A Milano – 5th Floor – Sala Riunioni,

h. 10.00 – 16.00

Categorie

Commenti recenti

Calendario

Novembre 2023
LunMarMerGioVenSabDom
  
 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30  

Tag

Delicious Link

  • Username not configured