Archive for the ‘Communications’ Category

About Project Poster

venerdì, luglio 30th, 2010

Here it’s possible to find a few documents about the poster

Poster instruction

faq v2_2

In summary every team has to prepare a 3 pages abstract and to select some images to be insert into the posters’ book.

Here it’s possible to find some examples of what the poster is supposed to be.

If you need more information just send me an email

See you soon

E

Next Project / Poster deadlines

venerdì, luglio 30th, 2010

Attached you can find a calendar about our next deadlines. (CONSEGNE ASP_studenti)

The program starts from September to final presentation in December.

Have a good Summer holiday.

See you in September.

Next steps and Skype meeting

martedì, maggio 18th, 2010

Dear students,

thanks for uploading your work.

By using Skype, on May 27 we will have a meeting to see the progress of the project (according to the examples shown below)

h. 14.00-15.00 _ TEAM A

h. 15.00-16.00 _ TEAM B

h. 16.00-17.00_ TEAM C


FEEDBACK

TEAM A| The index is to be defined more, add more depth and give it to a more systematic, you take the example of a report posted on the blog.

Organize the index from macro to micro, in the first part told about the research and in the second present the service and inspiration you have deducted from case studies.
Your project is not described, is not shown, is not detailed … how it develops?

We suggest you look at the work of TEAM B.

For the meeting of May 27, look at two examples added in this post and start to define and describe your project according to these formats.

TEAM B| Report index is well structured, detailed and complete.
The service description is just mentioned, you have to explode the different steps of the process by showing the links between service and users: how, where and by using tools / technologies
the service is provided.
You must add some minimum references about appearance and atmosphere of space.

For the meeting of May 27, look at two examples added in this post and start to define and describe your project according to these formats.

TEAM C| Report index is fairly structured. Organize the index from macro to micro, in the first part told about the research and in the second present the service and inspiration you have deducted from case studies.

The service must be described in detail, showing the stages of of the process, the physical interface and what is offered.

We suggest you look at the work of TEAM B.

For the meeting of May 27, look at two examples added in this post and start to define and describe your project according to these formats.

FORMATS:

1.  http://www.megaupload.com/?d=OCE28MOF

format used in a Sintesi finale project that contains  “ingredients” necessary to describe a service;

2. esempio descrizione Servizio FASP

format used in a Sintesi finale project that shows some examples of narrative and display, containing a good level of communication and aesthetics

To prepare for the meeting (May 27), by using the formats:

- define and describe the service,

- adapt according to the offer defined: touch points, locations, evidences…

We announce a seminar about interesting services: CREATIVITY AND LOCAL DEVELOPMENT, on  June 16 at the AULA CASTIGLIONI, Via Durando 10. You can watch the testimony of the founder of THE HUB.

Official Deadlines

lunedì, aprile 19th, 2010

The next official deadlines for ASP projects are:
- Oct. 31:  3rd progress report
- November: posters (towards the beginning of the month) and final reports (to 20).
Attached there is:
- Students of the guideline (in Chapter 5 you can find all the information about the final exams)
- Style sheet for the final report
- A facsimile of the cover of the final report.

a. report (style)

cover_final_report

Students guidelines_5th_cycle[1]

calendar-eng-apr_dec 2010

Workshop February 23rd

martedì, febbraio 16th, 2010

GIORNATA DI LAVORO | WORKING DAY

h. 10.00 – 10.30        Introduction to the workshop day activities - Stefano Maffei

PROJECT REVIEW

h. 10.30 – 11.00        Team A presentation
h. 11.00 – 11.30        Team B presentation
h. 11.30 – 12.00        Team C presentation
h. 12.00 – 12.45        Break / Discussion

MID TERM SLIDES REVIEW

h.  12.45 – 13.15       Team A  

h. 13.15 – 13.45        Team B

h. 13.45 – 14.15        Team C

Time scheduling December 2009 – March 2010

giovedì, novembre 5th, 2009

Activities agenda for the next deadlines.

ASP_time scheduling

New teams (Updated) & Workshop (4/11/09)

venerdì, ottobre 2nd, 2009

Attached you can find the final proposal for the teams; each group has an area to be developed.

The research will be presented at next meeting on Wednesday, November 4th at Politecnico di Milano (Bovisa) via Durando 38A Milano – 4th Floor – Sala Riunioni, h. 10.00.

During the month of research, share links and informations found.

ASP_NEW TEAMS

SCHEMA_DEL_SERVIZIO

New teams

giovedì, settembre 17th, 2009

Attached you can find the new teams

ASP_New teams

Workshop day – June 9th programme

martedì, maggio 26th, 2009

Dear teams,

here you can find the workshop programme.

Who

Stefano Maffei, Paola Bertola, Beatrice Villari, Pier Paolo Peduccio, Nicola Spiller, Alessandro Casinovi, Massimo Bianchini, Laura Laurenzi, Viola Chaira Vecchi.

What

Case histories presentation

Working method description

Where

Politecnico di Milano, Via Durando 38/A

V piano Sala riunioni

Agenda

h. 10.00

Introduction to the workshop day programme.

Taking stock of the situation (what we did? What will we do?)

h. 10.30

Presentation: Tissage. A knitwear workshop-store for on-site production and selling. – Laura Laurenzi

h. 11.00

Team A: Case histories presentation

h. 11.30

Team B: Case histories presentation

h. 12.00

Team C: Case histories presentation

h. 12.00 – 15.00

Brainstorming to elaborate several project proposals.

Identify project scenarios and elaborate service projects to develop a new kind of on-site knitwear production.

Particular attention will be given to develop some Service Ideas that:

- tackle issues and cruxes related with considered production process;

- Fall within the areas identified during WORK_01 and WORK_02 (Business, Distribution, Product, Service).

Output: a presentation (max 8 slides).

A project scenario to build a system that makes concrete the idea to design, produce and sale in a short time and in the same site (related to available technologies and alternative production systems).

h. 15.00

Brainstorming activity presentation (10’ for each team)

h. 15.30

ASP teaching staff discussion about:

Areas assignment,

Team’s output (case histories, project scenarios).

h. 16

Team’s presentation comment (case histories + scenarios)

Project-brief assignment.

Presentazione visite alle aziende [metà giugno, data da definire] – Alessandro Casinovi

Programma per visite a Carpi (SHIMA SEIKI, Sintesi FASHION Group) date – attività- logistica.

Planning dates

To do for collective meeting (June 9th):

venerdì, maggio 15th, 2009

- Case histories report (printed);
- Cases histories presentation (power point, flash, pdf, etc) containing:
       1. assigned case histories (images, main and innovative aspects),
       2. keywords map (WORK_01) updated with developed case histories,
       3. project scenarios related with issues, areas, experiences pointed out by analysed cases,
       4. opportunities / challenges of the identified project scenarios;
- digital report and presentation;
- post on http://www.newitalianlandscape.it/fasp every case history (proposed and approved) with a photo and a short abstract.

Categorie

Commenti recenti

Calendario

Marzo 2024
LunMarMerGioVenSabDom
  
 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Tag

Delicious Link

  • Username not configured